• Signing Ceremony and Opening Ceremony of Wanna Shenhe Holding Group and Henan Institute of Technology in 2017
    Signing Ceremony and Opening Ceremony of Wanna Shenhe Holding Group and Henan Institute of Technology in 2017 2019-12-16
    The signing ceremony and opening ceremony of the school-enterprise cooperation class jointly organized by Wanna Shenhe Holding Group and Henan Institute of Technology on November 8, 2017 at 10:00 am was held in Henan Institute of Technology. Chairman and general manager of the company, Mr. Li Yongxian, deputy general manager of the company, Ms. Duan Shufang, deputy general manager of the company, Mr. Chen Yuewen, person in charge of the personnel department, technical department and other functional departments, relevant leaders of Henan Institute of Technology, and recruited student representatives More than 40 people attended the signing ceremony and opening ceremony.
    Read More
  • 202 big correction ended, lifting operation ended with zero deviation
    202 big correction ended, lifting operation ended with zero deviation 2019-12-16
    Fuqing Nuclear Power Unit 2 was successfully connected to the grid at 6:33 on November 6, 2017. The overhaul of 202, which lasted 36 days and 6 hours, was officially concluded.
    Read More
  • The company's party branch held a branch general election meeting
    The company's party branch held a branch general election meeting 2019-12-16
    In order to further strengthen the party's grass-roots organization construction, in accordance with the relevant provisions of the Constitution of the Communist Party of China and the Interim Regulations on the Election Work of Grass-roots Organizations of the Communist Party of China, in the afternoon of October 20, 2017, all party members concentrated on the election of the party branch.
    Read More
  • Safety, quality and efficiency are all essential
    Safety, quality and efficiency are all essential 2019-12-16
    The overhaul of 202 is nearing the end of Ming Jin, and preparations for overhaul of 301 are in full swing.
    Read More
  • How is excellent quality made? Lifting operation see sewing pin drill
    How is excellent quality made? Lifting operation see sewing pin drill 2019-12-14
    Command, driver, and cable teamFrom the 102 and 202 overhauls of Fuqing Nuclear Power to the 301 overhaul that is being carried out in an orderly manner, Wanna ’s Fuqing Nuclear Power Hoisting Operation Project Department participated in the entire process, unloading and loading, lifting of the pressure vessel, and lifting of the core during the closing process. The hoisting of the sluice plate of the house, CC falling well, and other lifting and hoisting work were all completed safely and smoothly, and the zero deviation record of overhaul of industrial safety has been maintained so far.
    Read More
  • All party branches of Wanna Nuclear Group organized a live broadcast of the 19th National Congress
    All party branches of Wanna Nuclear Group organized a live broadcast of the 19th National Congress 2019-12-14
    At 9 am on October 18th, the comrades of the subsidiaries, branches, and project departments of the group were organized by the party branch secretary at the company headquarters, Zhejiang, Jiangsu, Fujian, Sichuan, Hainan, Guangdong, Shanghai, Henan and other places watched the live broadcast of the opening ceremony of the 19th National Congress of the People ’s Congress at the same time. When they heard the national anthem on the TV, everyone stood up from their seats and listened to the impassioned anthem. Let us be proud.
    Read More
  • Put your sleeves up and dry, who says women are inferior to men
    Put your sleeves up and dry, who says women are inferior to men 2019-12-14
    The Fuqing Nuclear Power 202 amendments are in full swing in an orderly manner. The various armies fight day and night in various overhaul positions. The maintenance support staff is also highly motivated and uses their own sweat to serve the overhaul and refuel.
    Read More