Core control rod inspection
Core control rod inspection
Work site
Work site
Work site 2
Work site 2
Nuclear fuel reception
Nuclear fuel reception
Mechanical equipment debugging
Mechanical equipment debugging
Treasury finishing
Treasury finishing
Lifting command construction site
Lifting command construction site
Equipment maintenance
Equipment maintenance
Equipment maintenance
Equipment maintenance
Equipment Overhaul 2
Equipment Overhaul 2
Field valve disassembly work
Field valve disassembly work
Pressure switch inspection
Pressure switch inspection
Overhaul of main pump
Overhaul of main pump
CO2 bottle hoist ..
CO2 bottle hoist ..
Dome commissioning test
Dome commissioning test
Core cover lifting
Core cover lifting
Lifting of core lower components
Lifting of core lower components
Gantry crane
Gantry crane
Lifting the main steam isolation valve
Lifting the main steam isolation valve
Lifting of main bolt drawing machine
Lifting of main bolt drawing machine
Turbine leaf hoisting
Turbine leaf hoisting