Our company successfully completed the phased work of "zero sewage straight discharge" in 24 township streets in Jiaxing

发布日期:2020-02-22

From December 13th to December 26th, under the entrustment of the Office of the Leading Group (Hechang System) of the "Five Waters of Governance" in Jiaxing, our company divided the four inspection teams into Xiuzhou, Nanhu, Haiyan, and Pinghu. Twenty-four township streets including Jiashan, Haining and Tongxiang have carried out the pre-acceptance inspection of "zero sewage straight discharge". The inspection work is strictly in accordance with the spirit of the provincial document and the requirements of the Municipal Water Management Office. The survey is carried out from four major areas: industrial parks, living quarters, other types (public construction), and public areas. The inspection methods are: 3. On-site random inspections, mainly inspections, rectification within a time limit.


   The inspection teams randomly inspected the work situation of "zero-sewage sewage" of residential houses, industrial enterprises, and six small industries in various towns and streets, and conducted serious inspections on the areas such as sewer pipes, open ditch pipes, rainwater outlets, and rainwater wells.


   Through strict instructions from city leaders and the full cooperation of town and township street leaders, the zero inline work has achieved phased results. Before the formal acceptance, assist the townships and streets to check out some existing problems and hidden dangers in advance, and then greet the inspection work at the provincial and municipal levels with a better image and appearance. Follow-up work will also be carried out on the eight township streets that have passed the 18-year inspection and acceptance to consolidate and improve the establishment of zero in-line sewage.