Promoting major repairs, spring festival storehouses full of spring feeling

发布日期:2019-12-16

The Fuqing Nuclear Power 103 amendment was staged during the New Year's Eve, the Spring Festival of the Year of the Dog is over half, and the festive atmosphere of the tool storehouse is still full of spring: the borrowers line up a long line, the New Year greetings for the first time after the year, and the smiling face that ushers in ... ...

 1519285369948593.jpg

In order to meet the needs of borrowing and overhauling tools for post-holiday repairs, the maintenance support department's Wanner tool library has reasonable scheduling and unified scheduling to ensure uninterrupted 24-hour service.


In order to meet the needs of overhauls for qualified tools and tools, the tool library has increased the frequency of safety and quality inspections of tools and tools, expanded sampling samples, and ensured 100% general inspection of safety tools and measuring tools to ensure the safety and quality of loaned tools and tools. Foolproof.


In order to meet the demand for the number of tools and equipment during the overhaul, the tool library has repeatedly hoisted the tools and tools from the tool room of Unit No. 3 to the tool room of Unit No. 1 to ensure that the 103 overhaul tools were borrowed nearby and distributed in full.


With the strong support of the Tool Division of the Service Division of the Maintenance Support Division, and the joint efforts of Wanna Tool Depot employees, the Tool Depot is escorting every day of the overhaul.


On February 19, 2018, the lending recovery of overhaul repair tools reached a climax. The daily lending and recycling volume of 9L208 hot tools exceeded 3212 pieces, creating a record high for the daily lending and returning of tools in the tool library.


Overhaul continues, and our efforts continue ...


1PX pumping station lifting column B shutter function referred ----- ZHAO Shu


Just after 5:00 on February 2, 2018, a harsh mobile phone ringing broke the silence of the former Xue Village in the early morning. Wanner lifted and operated Cui Jinming's crew to wake up from their dreams, facing the steep street lights under the dim street lights. Chenfeng hurried to the gate of Fuqing Nuclear Power.


Under the dim streetlight, a pickup truck carrying Xiamen divers was rushing to Fuqing Nuclear Power.


The employees of Shenyi Drainage received the instructions almost at the same time and rushed to the scene as soon as possible.


Shi Jun, the interface person of the Service Section of the Maintenance Support Department, also got up early to perform the duties of on-site monitoring.


The first high-risk battle of the 103 overhaul is about to begin, and the hoisting of the sluice plate of the BX pump room of Unit 1 will begin!


Safety belts and anti-fall devices are complete, and alert isolation is in place.


Before the start of the work, risk analysis, technical knowledge, and experience feedback will be standardized.


The diving communication system is normal, the breathing system is normal, anti-fall measures are in place, and the dredging of the dive begins.


The initial desilting of the sluice trough is over. The first sluice sluice is ready to be hoisted and cleared in the hoisting area.


The seawater is at a low tide and is suitable for lifting into a sluice.


The hanger hook and unhooking are normal, and the hook strapping is completed.


With a command from the lifting command, the first sluice board slowly left the sluice storage pool. Under the escort of the cable officer, it crossed the fence of the storage pool and stopped firmly above the sluice slot.


9:56 As the crane changes speed slowly, it falls, the shutter is in place, decouples, and it is done in one go. The first sluice is hoisted in place.

 1519285398937246.jpg

10:45 With the joint efforts of all the participating units in the maintenance support department, the second sluice plate was quickly hoisted into place.


Drain, observe the water level, and start ...


At 18:40 night has come, the sea breeze whining with the drizzle, and the waves beating back and forth on the coast disturbingly.


 1519285417914342.jpg

There are many good things. The two sluices that were hoisted in the morning have leaks, and the numbers on the water level meter have been reluctant to drop.


Colleagues from Wanna lifting operations, Xia Min diving divers, Shen Yi's drainage staff, and Shi Jun coordinating engineer from the service department, once again gathered at the seaside of the 1PX pump room.


The wind is taking advantage of the rain, the rain is taking advantage of the wind, and the sea is rising. God seems to have an opinion on us breaking the silence on the seashore, and it is causing trouble from time to time.


Lift the sluice again, dredging again, plugging again, draining water again, observing the water level, recording the time, and calculating the speed of the water level falling down ...


At 23:35, the number on the water level meter dropped 14 centimeters at a rate of 15 minutes, and fell aggrievedly. The leak was finally controlled, and the hoisting of the sluice board came to an end.


Late at night, after a busy day, colleagues finally set foot on the road back to the village, wet clothes and hair, I do not know whether it is rain or sweat ...